Project Detail
Maple Street Storm Sewer Drainage
Challenge
The City of Lawrence needed help designing a 90-cubic-feet-per-second (CFS) pump station and storm sewer system for an area of town that had previously experienced extensive flooding.
Solution
Bartlett & West performed an engineering study to validate a previous hydrologic study for the watershed and design a system to handle the 50-year storm flows for the project area. A new gravity storm sewer system was designed for a topographically-depressed area in north Lawrence. This gravity system fed to a new 90 CFS pump station and force main that fed into a second gravity system between the Union Pacific Railroad (UPRR) and the Kansas River outfall. The force main was constructed under the railroad and Bartlett & West coordinated with the City and the railroad to obtain the necessary design criteria, permits and fees associated with the 48-inch storm sewer force main crossing the railroad right-of-way.
Value
Through thorough planning and coordination with stakeholders and property owners in north Lawrence, a much more effective storm sewer drainage management system was constructed with minimal traffic disruption to the surrounding properties.
Tell us about your project
We’d love to work with you. Tell us the services you are seeking and one of our team members will connect with you.